Now sourcing for data center projects across Indiana and the Midwest.Send a spec
How we work

Three routes to equipment that ships sooner.

Most buyers wait in one factory queue. We look across many, and across units that already exist.

Factory slots

Capacity where it actually exists.

We track open production slots at transformer and switchgear plants in India and other countries that build to US standards, and place your order where the line is free.

  • 60 Hz ANSI/IEEE C57 designs
  • DOE 10 CFR 431 efficiency
  • UL-listed lines where your install needs it
See equipment
Tested surplus

Units that already exist.

New-surplus and refurbished equipment from cancelled projects and decommissioned sites. Every unit is inspected, oil-tested and documented before you commit.

  • Transformers, switchgear, gensets, UPS
  • Test reports and photos up front
  • Delivery in weeks, not quarters
Ask what is available
One contact

From purchase order to energization.

Submittals, witnessed factory tests, third-party inspection, DOE filing, freight and customs. You talk to us; we handle everyone else.

  • Submittal packages your engineer can approve
  • Factory acceptance tests, witnessed
  • Delivered duty paid to site
Start a request

What happens after you send a spec.

Five steps, one person to call. You always know where your equipment is and what comes next.

  1. 01

    Send a spec

    A one-line rating, a single-line diagram or a full specification. Tell us when you need it energized and where.

    You get a reply the same week, usually sooner.

  2. 02

    Options in 48 hours

    Factory slots and surplus units that fit, each with price, delivery date and the standards it is built to.

    You get a side-by-side you can take to your team.

  3. 03

    Submittals and approval

    Drawings, nameplate data and test plans prepared for your engineer of record before anything is committed.

    You get a submittal package ready to approve.

  4. 04

    Build, test and inspect

    Factory acceptance tests, witnessed in person or by video. Oil analysis and independent inspection on surplus units.

    You get test reports before the money moves.

  5. 05

    Ship to site

    Freight, customs and DOE filing handled end to end, delivered duty paid to your laydown yard.

    You get one contact until energization.

A pad-mount transformer ordered today can take more than a year to arrive. We come back with real options in 48 hours.

40 to 65 weeksTypical pad-mount wait
72 to 104 weeksTypical generator wait
48 hoursOur first answer

Your schedule,
our problem.

A one-line spec is enough to start. We reply within 48 hours with options, prices and delivery dates.